Emerson Hall
January 22, 2024

classroom with movable table and chairs arranged in rows

After undergoing a six-month renovation, classrooms 101 and 108 in Emerson Hall have reopened. The renovations converted the spaces from a traditional fixed-seat lecture hall format into a more flexible classroom environment with movable tables and chairs.

Harvard Hall
January 27, 2020

Harvard Hall 105 classroom image

After a 7-month long exterior restoration and interior renovation project, Harvard Hall has reopened for classes. The newly renovated spaces include a lecture hall, two (2) traditional seminar rooms, two (2) 24-seat flexible classrooms, an additional 60-seat flexible classroom (a mirror of the popular Harvard Hall 202), and an open and welcoming lobby.

Sackler Building
January 28, 2019

Sackler 422 photo

After an extensive building renovation project, the Sackler Building has reopened for classes. The five (5) new/renovated spaces include a spacious lecture hall, two (2) traditional seminar rooms, two (2) flexible classrooms, and an art-making classroom.

Robinson Hall 
January 28, 2019

Robinson Hall 222 photo

After a six-month renovation, Robinson Hall has reopened to classes. Part of the renovation included the redesign of the second-floor meeting rooms. The four (4) cramped, outdated spaces have been converted into two (2) spacious, accessible seminar rooms (Robinson 222 and Robinson 223).

Science Center Lecture Halls
September 4, 2018

Science Center Lecture Hall D

During Summer 2018, Science Center Lecture Hall C & Lecture Hall D were taken offline for a major upgrade to the HVAC system. We used this opportunity to renovate and restore some of the interior elements of the Josep Lluís Sert designed spaces.

Vanserg Building
August 30, 2017

Vanserg Building

During summer 2017, the second-floor classrooms in the Vanserg Building were completely transformed from small, cramped seminar and lecture rooms to larger, flexible classrooms. Additional information about the renovated spaces can be found on the Vanserg Building page.
 

Cabot Science Library
April 10, 2017

Cabot Library

The Cabot Science Library re-opened on April 10, 2017 after a long substantial renovation. The new Cabot has been transformed into an open, welcoming and vibrant space for all Harvard students, faculty and staff.
 

Harvard Hall 202
August 29, 2016

Harvard Hall 202 photo

Harvard Hall 202 provides flexible teaching space for faculty who want to teach beyond the traditional lecture hall.

 

Museum of Comparative Zoology 101
August 29, 2016

MCZ 101

MCZ 101 is a flexible classroom in the Harvard Museum Complex.

 

Northwest Building B100
September 2, 2015

Northwest B100

Northwest Building B100 has been transformed from an event and lounge space into a 150-seat flexible classroom.

 

Robinson Hall 105
August 28, 2015

Robinson Hall 105

Robinson Hall 105 provides flexible technology-rich teaching space for faculty and students.

 

Robinson Hall 106
August 28, 2015

Robinson Hall 106

Robinson Hall 106 provides faculty and students with up-to-date technology in a traditional seminar style space.

 

Robinson Hall 107
August 28, 2015

Robinson Hall 107

Robinson Hall 107 is a flexible teaching and learning space for faculty and students.

 

Science Center B10
August 27, 2015

Science Center B10

Science Center B10 has been redesigned to include moveable, lightweight furniture and writing surfaces on every wall.